Skip to main content

Cumberland High shuttered by burst pipe

January 6, 2014

CUMBERLAND – Classes were expected to resume today at Cumberland High School, which was closed Monday after a pipe that heats a section of the building froze and ruptured Saturday, flooding at least 12 classrooms on three floors with water, school officials said.

The mishap occurred around 12:30 p.m. and involved an isolated heating pump drive coupler, which causes water to flow through a pipe that heats a section of the school.

Full story on Page 1 of Tuesday's Call.

PAWTUCKET — While teammates in Double-A Portland, Matt Spring had the opportunity to catch...
BRISTOL, Conn.  – Cumberland American All-Stars mentor Dave Belisle received a phone...
A little of this a little of that…   As Red Sox management is already well aware...
The state beach concession stands cited for more than 70 food code violations last month were re-inspected Friday...
PROVIDENCE – Even if he had not withdrawn his high bid, Cranston state Rep. Peter Palumbo would not have been able to...
Fly strips hanging over food preparation areas; cans of clam chowder stored in restrooms; mold in ice machines; fish...

 

Premium Drupal Themes by Adaptivethemes